- Development of 54 houses, the bulk of these being 3 and 4 bedrooms with a few 2 and 3-bedroom apartments.
- The stunning location within Ribble Valley along with the desired high spec finishing’s has led to the first phase properties becoming much sought after.
- Site clearance and earth works to cut and fill large area of the site.
- Traditional foundations and suspended beam and block floors.
- Roads and sewer works, deep sewers installed using aquaspira 1200 and 1050 pipes with multiple connections.
- 106 highway drainage off site connection for foul water into existing highway M.H on chapel Hill to conform with U.U requirements and local authority.
- Reinforced cavity retaining walls.
- Produce an in depth and expansive risk assessment and method statement to provide a reinforced concrete slab cast in situ to protect a live 750 Dia. U.U. water main which is present on site.
- 278 works forming new junction on to Chapel Hill.
- Plot slabs and domestic drainage.
- Tarmac finishing’s to access roads and driveways.
- Contract continues.